MIA North Terminal

9 gates for a total of 50 gates, 20 refurbished jet bridges, 28 new jet bridges, 1.8 million square foot of renovation, including exterior renovations and 1.9 million square foot of new construction.

Overview

North Terminal Re-Development Program at Miami International Airport

The North Terminal project at Miami International Airport involved the transformation and expansion of Concourses A through D from a finger-type configuration into a more efficient, mile-long linear terminal. The project included the addition of nine gates, bringing the total to 50, refurbishment of 20 existing jet bridges, installation of 28 new jet bridges, renovation of approximately 1.8 million square feet of existing space, and construction of approximately 1.9 million square feet of new facilities. Additional improvements included a 400,000-square-foot Federal Inspection Building and a mile-long rooftop Skytrain connecting the length of the terminal with multiple stops.

Nutting Engineers of Florida provided geotechnical exploration and engineering services, pile load testing, pile installation monitoring, grout testing, construction materials testing of onsite and imported materials, and special and threshold inspection services for various aspects of the project.

Projects

View Other Projects

  • Residential Tower The Wave at Bayshore

    An 11-story, 89,000 gross sq. ft., 18-unit luxury condominium building.

    Read More

  • Retail Sawgrass Mills Mall

    A 94,000 sq. ft. retail building and four-story, 420,000 sq. ft. parking garage.

    Read More

  • Lake Worth Storage

    A four-story, 99,800 sq. ft. storage facility with paved parking and drive areas on a…

    Read More

Back to top