Service Since 1967

Florida Offices & Labs

Miami-Dade (305) 824-0060
Palm Beach (561) 736-4900
St. Lucie (772) 408-1050
Broward (954) 941-8700
Toll Free (877) NUTTING

 





Featured Project

Regional Wastewater Collection System

Cudjoe Key, Summerland Key and Upper Sugarloaf Key, Florida

Description & Scope:

Cudjoe Key: Nutting Engineers of Florida, Inc. (NE) performed the geotechnical exploration/engineering services that included fourteen 25', ten 15', and eighteen 8' standard penetration test borings (SPT's) for the construction/ installation of new gravity sanitary sewer lines, force mains and fourteen (14) pump stations throughout Cudjoe Key.

Summerland Key: NE performed the geotechnical exploration/engineering services that included eleven 25', two 15', seventeen 8', and ten 10' standard penetration test borings (SPT's) for the construction/ installation of new gravity sanitary sewer lines, force mains and eleven (11) pump stations throughout Summerland Key.

Upper Sugarloaf Key: NE performed geotechnical exploration/engineering services consisting of one 25', two 15', twenty eight 8', and one 10' standard penetration test borings (SPT's) for the construction/ installation of new gravity sanitary sewer lines, force mains and one (1) pump station throughout Upper Sugarloaf Key.

 

Team:

Client:

Florida Keys Aqueduct Authority
1100 Kennedy Drive
Key West, FL 33040

General Contractor

Mathews Consulting, Inc.
477 South Rosemary Avenue, Suite 330
West Palm Beach, FL 33401